Explore the proposed lab

The current plan for the Cy4CEA lab at the ISU Research Park. Turn the 3D model, see what goes where, and how a robot moves a crop.

Under consideration and subject to change. This is concept geometry, not a survey. Layout, equipment and numbers will change as the plan is reviewed.

The whole proposed lab seen from above: two NFT racks and a water zone on the west, a robot floor in the middle, robotics desks and the entry room in the south-east, mung, saffron and the sink on the north side
The whole lab from the south-east. Click any picture to enlarge it.

Turn the model

Drag to rotate, scroll or pinch to zoom, right-drag to pan. Pick a view, or play the cassette transfer.

Loading the model (10 MB)

What goes where

Water and crops on the west and north, dry work on the east and south, robots in the middle. Drains, taps, the sink and doors stay where they are.

Top view of the model laid over the building plan, showing every zone
The model laid over the building plan.
ZoneWhere and why
NFT, 36 experimentsTwo existing racks, loaded from both sides, ends at the water wall
Robot floor18 pots in a grid with a lane all round, so a robot can circle each one
Mung and saffronPallet racks on the north side, by the sink and tap
Planting and harvestPlanting table by the sink; harvest tables in the centre by a drain
Robotics and demosDry east side, where visitors can watch robot arms being built
Entry roomLockers and desks, with a window into the lab

How a cassette comes out

Each experiment grows in a cassette. A rolling lift brings it down to bench height for imaging and care.

Lift deck latched to the rack at the top tier, with a strap drawing a cassette onto the deck
Top tier, part way out.
  1. Raise the lift deck to the tier and latch it to the rack.
  2. The cassette's pump stops and its channels drain.
  3. Hook a strap to the cassette and turn the crank. The cassette slides onto the deck. It carries no plumbing, so nothing is unlatched.
  4. Lower it to bench height. No hoses to reconnect.
  5. To return it, raise the deck and push it back until it latches.

Water and nutrients

  • Every cassette is its own experiment, with its own tank, pump, probes and dosing pumps. That gives 36 separate nutrient loops.
  • Fixed nozzles drop water into the channels across a small air gap. Nothing connects to the cassette.
  • Channels drain by gravity back to the same tank. No loop shares water with another.
  • Stock jugs for nutrient A, B, pH down and pH up sit in a spill tray at each bay.
  • Cassettes sit back to back in pairs. Each pair shares its light bars and fans.
  • A drip pan under each upper cassette returns any leak to its own tank.
A blue feed rail above the end of a cassette, with four short nozzles pointing down at the four channels
The feed: four nozzles above the channel inlets.

The parts, close up

Rendered from the same model. Click a picture to enlarge it.

Control, built for AI agents

An agent can read data and change setpoints, recipes and schedules inside set limits. It never drives a pump directly.

One cassette, one loop

Thirty-six identical loops. Nothing is shared between them except clean water in and waste out.

Rack header3/4 in, 20 psiMaster valveone per rackFill meterone per rackFill valve FV24 V, closed at restFloat valvesecond shut-offfalls through an air gapTank, 15 gal. Works at 10 in depth, about 12.5 galpHECTLSHLSLprobes and level switches at the aisle end of the tankABpH-pH+4 dosing pumpsin the bay dosing boxbay jugs in a spill tray, under 3 ft from the pumpsValveand strainerP24 V pumpDrain valve DVclosed at restDrain line1/2 in under rampFloor drainriser, 1/2 in PVClift 1.6, 4.1 or 6.6 ftCassette4 channels, 1 L/min eachFlow FTthen fixed nozzlesDrip pantiers 2 and 3, drains to the returnsensor portgravity return: own trough, 1-1/2 in downpipe, mesh sock
One loop. Solid lines are pumped. Dashed lines fall by gravity. The pump that feeds the cassette also empties the tank when the drain valve opens.

What an experiment can vary

Thirty-six loops give twelve nutrient treatments in triplicate. Light and air are set per pair of cassettes.

FactorSet perIndependent unitsHow
Nutrient strength and pHCassette36Dosing pumps hold a conductivity and a pH target
Ratio of the two nutrient stocksCassette36The two dosing pumps run in a set ratio
The stock solutions themselvesBay of six cassettes6Each bay has its own jugs
Flow rateCassette36Pump speed
Crop or cultivarCassette36
Day length and light levelPair18Switching and dimming
Air speed over the leavesPair18Fan speed
Air temperature, humidity, CO₂Room1Measured in every bay, not controlled per unit

Plant numbers and border rows

Channels are grouped in fours so that some plants have a neighbour on every side.

One cassette16 plants, 4 interiorOne pair, same treatment32 plants, 12 interiorinterior plantborder plantPlants sit 8 in apartboth ways. The dashed lineis the gap between the twocassettes of a pair.
One cassette has four interior plants. Running both cassettes of a pair on one treatment gives twelve.
  • Each cassette holds 16 plants at 8 inch spacing, 576 in the lab.
  • A study that needs more interior plants runs a pair as one plot, and halves its treatments.
  • Each tier has its own light bars 15 inches above the channels, so no tier shades another.
  • Expected light at full power is about 220 µmol/m²/s. It will be measured on the first pair.

What is measured

Every reading is stored with a time stamp and the cassette's crop and treatment labels.

WhereMeasuredHow often
Each tankpH, conductivity, solution temperature, low and high levelEvery 10 seconds
Each cassette feedFlowContinuous
Each cassette sideAir temperature and humidityEvery 10 seconds
Each pairLight on, fan runningContinuous
Each bayCO₂, leakEvery 10 seconds
Each rackWater added to each tank, which is the plants' uptakePer fill
Any cassetteColour and near-infrared imagesOne shared camera, on request
Each cassette returnAn open port for a reference probe or a trial sensorWhen fitted

Built to fail safely

What happens when something goes wrong.

If this happensThe design does this
A pump stopsA flow alarm within two minutes. Only one cassette is affected. Every pump has a hand switch that works with the controller off.
A leak at a tierA pan under each upper cassette returns the water to its own tank. A tray under the tanks holds a leak sensor that shuts the fill valves.
A fill valve sticks openA float valve behind it closes. A level switch and a time limit close a second valve on the rack.
The power failsLights and fans go off. Batteries keep every pump cycling for about a day.
The network or a computer stopsEach bay controller notices within 10 seconds, shuts its valves and keeps the water moving.
A dosing errorDose limits sit in the controller, outside the software an agent can reach.
Root disease in one loopNo loop shares solution with another, and the feed crosses an air gap.
A rack is pulled or pushedLevelling feet replace the casters, and each rack is pull-tested before use.

The cassette

A frame of aluminium extrusion carries four channels. It slides out to the aisle and carries no plumbing and no wiring.

35.0 frame36.5 overall32.0 channel30.6 frame8.08.08.03.33.64.08.08.08.09.814.41234678910HIGH END: water inLOW END: water outAISLE SIDE: the cassette slides out this waySPINE SIDE
Plan of one cassette, in inches. Water enters each channel at the high end and leaves at the low end into a collector that pours toward the middle of the rack.
from the fixed nozzle0.8 fall53/4 shim53/8 shimSeen from the aisle. The frame is level. The two shims give the slope of 1 in 40 and lift the open ends over the runner.
From the aisle. The frame stays level. Two shims give the channels their slope.

How a bay goes together

A bay is the unit that is built, tested and repeated. Each picture is the same cut through a bay. Parts added at that stage are amber.

lift aislemiddle aisletank, south rowtank, north rowcover
Tanks on a deck under the bottom tier, three at each face.
lift aislemiddle aisletroughsensor portdownpipe to its own tank
A pump and riser for each cassette, and its own return pipe.
lift aislemiddle aislebay paneldosing boxpump switchesstock jugs
Fill line, probes, the bay panel, dosing pumps and stock jugs.
lift aislemiddle aislecassette, four channelsseated switch
Light bars, fans and six cassettes.

Light height and blackout

Each pair sets its own light height and its own day length. One motor moves the light frame. Two motor blinds close the pair.

drip pan of the tier above closes the topwinding shaft with a 24 V tube motor, four cordslight frame: six bars on two railslowest: 6 in above the channelshighest: 17 in, under the drip panfixed panelvent band witha light trapblackout blind,motor in the rollsouth aislevent band,light traptwo fans ride on the framesame blind onthis facemiddle aisle
One pair, cut across the rack. The light frame and its two fans ride up and down on four cords. Each aisle face closes with a blind. Bay sides and the top are fixed panels.
The computer sendsThe part does the rest
Light frame up, light frame downThe tube motor winds or unwinds four cords. Its own end stops halt it at the top and bottom.
South blind up, down. North blind up, downThe motor in each roll runs to its own end stop.
Lights on or off, dim levelAs before: one relay signal and one 0-10 V level per pair.

Built in phases

Each phase ends with a lab that works. If funding stops, the build stops at the end of a phase.

PhaseWhat is builtWhat works at the end
1. One pairTwo cassettes at tier 3 of bay A1 with everything: loops, light lift, blinds, bay panel, lab computer. Rack rework, stairs and the light meter.Two cassettes grow a crop under full control. Filled and drained by hose. Every design risk has been tested.
2. Bay A1The other four loops and cassettes of bay A1.Six independent loops. Enough for one small replicated trial.
3. Water, drain and batterySupply header, reverse osmosis, drain line, new circuits, three batteries, backflow preventer.Bay A1 fills and drains itself and rides through a power cut. The room is ready for more bays.
4. Rack ABays A2, A3 and A4 with their cassettes.24 loops on one rack. Four replicates of six treatments.
5. Rack BBays B1 and B2 with their cassettes, and the spare pumps.All 36 loops. The grow system is complete.
6. Lift and instrumentsMast lift, pull winch, shared camera, reference meters.One person can pull a tier 3 cassette. Until now that takes two people on the rolling stairs.
7. The rest of the roomRobot lockers, cage, benches, cameras, server cabinet, vine bay.The pot rows, the vine bay and the robot areas are fitted out.
8. Blackout on the other 17 pairsBlinds, panels, vents and switches for every pair after the first.Any pair can run its own day length. Before this, only the first pair can.

Build documents

Everything needed to order, build and test the lab. Prices are estimates and change with each revision.

Animations

Rendered from an earlier version of the model. Updated clips are in progress.

Lift transfer: the lift pulls a cassette from the top tier and lowers it.
A walk around the whole lab.

Views

Still open

Ceiling height above the racks, the light fixtures and their power, structural and Facilities sign-off, and vendor quotes. The plan will change as these are settled.

Back to the main page