Cy4CEAWork with us

Cy4CEA grow lab: design for review

Room 7551 will hold 36 small hydroponic units. Each one runs as its own experiment, and an AI agent can set and read every one. This page shows how a unit works, what can fail, and what we need you to check.

17 November 2026A proposal. Nothing is orderedA separate build spec holds the part numbers and wiring

What we need from you

  1. Is one cassette of 16 plants, 4 of them interior, a usable experimental unit?
  2. What fails first in a system like this? Section 6 lists what we have covered and what we have not.
  3. Which crops should the first year cover?
  4. How long can roots sit between wettings in the dark? That sets how the pumps cycle in a power cut.
  5. Is the rack safe to load as drawn? Section 9 gives the loads.

1. The lab at a glance

One end of rack A seen from the lift aisle. Three tiers of cassettes with lettuce, light bars above each tier, and a row of white tanks under the bottom tier.
Rack A from the lift aisle. Tanks sit under tier 1, three to each face of a bay. Each tank serves one cassette.

The two existing racks stay where they are. Their long channels are cut into short ones and grouped four to a tray. We call the tray a cassette. A cassette slides out to the aisle onto a lift and carries no plumbing.

Racks, existing
2, each 9 ft tall, 18 ft 8 in long, 5 ft 8 in deep
Tiers
3
Cassettes
36: 24 on rack A, 12 on rack B
Plants per cassette
16, in 4 channels
Plants in the lab
576
Nutrient loops
36, one per cassette
Light and air zones
18, one per pair of cassettes
Space left on the racks
4 empty bays, 24 more cassettes

A pair is two cassettes back to back on one tier. They share a light frame and two fans. Each has its own water.


2. One cassette, one loop

Rack header3/4 in, 20 psiMaster valveone per rackFill meterone per rackFill valve FV24 V, closed at restFloat valvesecond shut-offfalls through an air gapTank, 15 gal. Works at 10 in depth, about 12.5 galpHECTLSHLSLprobes and level switches at the aisle end of the tankABpH-pH+4 dosing pumpsin the bay dosing boxbay jugs in a spill tray, under 3 ft from the pumpsValveand strainerP24 V pumpDrain valve DVclosed at restDrain line1/2 in under rampFloor drainriser, 1/2 in PVClift 1.6, 4.1 or 6.6 ftCassette4 channels, 1 L/min eachFlow FTthen fixed nozzlesDrip pantiers 2 and 3, drains to the returnsensor portgravity return: own trough, 1-1/2 in downpipe, mesh sock
One loop. Solid lines are pumped. Dashed lines fall by gravity. Nothing is shared between loops except clean water in and waste out.
  • A covered 15 gal tank sits under the rack and works at about 12.5 gal.
  • A 24 V pump lifts 4 L/min up a riser to the cassette.
  • Four fixed nozzles drop 1 L/min into each channel across a small air gap. Nothing connects to the cassette.
  • The film runs down a 1 in 40 slope over 32 in and returns by gravity to the same tank.
  • Probes in the tank read pH, conductivity and temperature.
  • Four small dosing pumps hold the setpoints: stock A, stock B, pH down and pH up.
  • The tank fills with reverse osmosis water through two valves in series.
  • The same pump empties the tank to the floor drain when the recipe changes.
Close view of one cassette at the rack. A blue pipe rises from below and ends in a rail with four small nozzles, one above each channel.
The feed. Four nozzles sit above the channel inlets. The cassette can be pulled without undoing anything.

3. What an experiment can vary

FactorSet perIndependent unitsHow
Nutrient strength and pHCassette36Dosing pumps hold a conductivity and a pH target
Ratio of stock A to stock BCassette36The two dosing pumps run in a set ratio
The stock solutions themselvesBay of six cassettes6Each bay has its own jugs
Flow rateCassette36Pump voltage, 0.5 to 1.5 L/min per channel
Crop or cultivarCassette36
Day length and light levelPair18A relay for on and off, dimming from 10 to 100 percent
Air speed over the leavesPair18Fan speed
Air temperature, humidity, COâ‚‚Room1Measured in every bay. Not controlled per unit

Thirty-six loops give twelve nutrient treatments in triplicate. A light study has 18 units, so nine treatments in duplicate or six in triplicate.

Full power gives about 220 µmol/m²/s at the canopy, or 12.7 mol/m² over a 16 hour day. That is an estimate until the first pair is measured. Each pair can now be blacked out with motor blinds on its two aisle faces and fixed panels on its sides. The light trap for the fans is untested.


4. Plant numbers and border rows

One cassette16 plants, 4 interiorOne pair, same treatment32 plants, 12 interiorinterior plantborder plantPlants sit 8 in apartboth ways. The dashed lineis the gap between the twocassettes of a pair.
Interior plants have a neighbour on every side. A single cassette has four. Running both cassettes of a pair on one treatment gives twelve, but halves the number of treatments.

The 17 November meeting asked for channels in groups of four so that some plants are interior. One cassette does that with 16 plants. A study that needs more interior plants can run a pair as one plot.

  • Destructive sampling takes plants from a small plot fast. Four interior plants allow few harvest dates.
  • The tier above shades nothing. Each tier has its own bars on a motor-driven frame, 6 to 17 in above the channels.
  • Plants at the aisle edge get more moving air than plants at the spine.

We would like your view on the smallest plot you would accept for lettuce, cilantro and strawberry.


5. What is measured

WhereMeasuredHow often
Each tankpH, conductivity, solution temperatureEvery 10 seconds
Each tankLow and high levelContinuous
Each cassette feedFlowContinuous
Each cassette sideAir temperature and humidityEvery 10 seconds
Each pairLight on, fan runningContinuous
Each bayCOâ‚‚, leakEvery 10 seconds
Each rackWater added to each tank, which is plant uptakePer fill
Any cassetteColour and near-infrared imagesOne shared camera, on request
Any tankHandheld pH, conductivity, dissolved oxygenWeekly check by a person

The tank probes run the dosing. A handheld meter is the reference for all of them.

Each cassette also has a plugged port where the solution leaves the roots. A reference probe or a trial sensor can sit there. No such sensor is chosen yet.

Not measured: light spectrum, leaf temperature, single nutrients such as nitrate or potassium, and root images.

Tanks under the rack with dark covers. Three probes and two level switches stand at the aisle end of each cover.
Probes and level switches stand at the aisle end of each tank, where a person can reach them.

6. What can fail

FailureWhat the design doesStill open
A pump stopsThe flow sensor raises an alarm within 2 minutes. Only one cassette is affected. Four spare pumps are on the shelf. Each pump has a hand switch that works with the controller off.Nobody is in the lab at night. An alarm needs a person who answers it.
One nozzle clogsEach loop has a strainer ahead of the pump and a mesh sock on the return.The flow sensor reads the whole cassette. One dry channel in four may not trip it.
A leak at a tierA pan under each upper cassette drains back to its own tank. A tray under the tanks holds a leak sensor that shuts the fill valves.
A fill valve sticks openA float valve behind it closes. A high-level switch and a 10 minute limit close a second valve on the rack.
A tank runs lowThe low-level switch stops the pump and raises an alarm. The tank refills by itself in normal running.
A power cutLights and fans go off. Batteries run every pump 1 minute in 5 for about 24 hours.The safe gap between wettings. The run time is an estimate until tested.
The network or a computer stopsEach bay controller notices within 10 seconds, shuts its valves and keeps the water moving. Dosing pauses and resumes.
A dosing errorLimits sit in the controller, outside the software: 20 seconds a dose, six doses an hour, never acid and base within 10 minutes.
A probe driftsA weekly check against the handheld meter. Recalibrate at 0.2 pH.That is 72 probe checks a week. It is the largest routine job in the lab.
Root disease spreadsNo loop shares solution with another. The feed crosses an air gap. A dye test on the first pair checks for carry-over.Splash and airborne spread between neighbours are reduced, not ruled out.
AlgaeTanks are wrapped and covered. Channels have lids.
The room overheats or stays dampThe racks fill in stages while room temperature and humidity are logged.The lab adds about 7 kW of heat and up to 200 pints of water a day. Facilities has not said what the room can remove.
A rack rolls or tipsLevelling feet replace the casters. A pull test at 7 ft comes before first use.A structural check. See section 9.
Cleaning falls behindA cassette goes to the sink whole. A tank pumps itself out.Thirty-six tanks and 144 channels to clean each crop cycle.

7. Power cuts

The pumps, valves and controllers run at 24 V. Three power supplies feed them, and each charges its own battery. The lights run from wall outlets and are not backed up.

Batteries
3, each 24 V 100 Ah lithium iron phosphate
Energy stored
7.7 kWh in total
Load on battery, all 36 loops
about 265 W
Run time
about 24 hours

The load assumes each pump draws 25 W and runs 1 minute in 5. Both figures will be measured on the first pair.

A dark steel cabinet on short legs at the end of a rack, with the power supply panel mounted above it.
The battery cabinet stands on the floor at the dry east end of each rack, under the supply panel. It stays clear of the tanks and the water header.

8. Not designed yet


9. Questions by reviewer

Plant science

  • Is 16 plants per loop enough, and when would you pair cassettes?
  • Is 220 µmol/m²/s enough for the planned crops?
  • Reverse osmosis or tap water as the base? Ames tap water is pH 9.5 with 145 ppm hardness.
  • Does every loop need a pH up pump, given an acidic two-part fertiliser?
  • Is 12.5 gal for 16 plants enough buffer, or too much to change often?
  • How long may roots sit between wettings with the lights off?

Operations

  • Which of the failures in section 6 have you seen most?
  • Is a weekly probe check realistic for 36 loops?
  • What would you want to reach by hand that this layout hides?

Structure

  • The racks stand free on casters today. The plan is levelling feet and no anchors unless Facilities allows them.
  • Each loaded bay carries about 700 lb of tanks and water on the bottom rails.
  • Each bay also carries six cassettes at about 65 lb each, the highest at 7 ft 2 in.
  • A lift latches to the rack, and a hand winch pulls about 50 lb on the frame at 7 ft.
  • Is the frame sound for these loads, and is the rack stable against that pull?
The spine of the rack with the bottom tier lifted away. Green return pipes drop into the tanks and pale blue fill pipes branch to each one.
Inside the rack. Green pipes return each cassette to its own tank. Pale blue pipes fill the tanks.

10. Cost and status

The parts list sums to about $206,000 against $200,000. Every figure is an estimate. Nothing is quoted. The plan is to build and test one pair before ordering the other seventeen.