Fifteen steps take a bare rack bay to six running cassettes. Every picture is the same cut through the bay, looking along the rack. Parts you fit in a step are amber. Parts already fitted are grey.

Revision D, 17 November 2026Goes with the build spec and the order listA proposal: measure before cutting

Before you start

  1. Build tier 3 of bay A1 first, with water only. Do every step for those two cassettes, run the checks, then add tiers 1 and 2.
  2. An electrician fits the outlets, the outlet strips and anything at mains voltage. You build the 24 V side and plug in listed equipment.
  3. Part numbers such as A03 match the order list.
  4. Three fits are unproven: three tanks between the posts, six pumps in a 10 in gap, and probe leads reaching the panel. Mock them up in cardboard first.
fitted in this stepfitted earlierRisers and downpipes are drawn in full for tier 3 only. Tiers 1 and 2 are the same, shorter.

What is kept from the lab today

KeptWhere it goesUsed in
Two aluminium racks, 18 ft 8 in × 5 ft 8 in × 9 ftKept as racks A and B at the positions on the plan. Check where they stand now; a rack may have to move. Casters come off; levelling feet go on. Six layers become three tiers.Step 1
NFT channels and lidsCut into 32 in pieces, four to a cassette. 144 pieces needed.Step 15
Long LED bars, over 7 ftToo long for a bay. They move to the pot rows, the vine bay and the mung and saffron racks.Not in this guide
Three 275 gal totesClean-water store in the water zone at the west wall.Water zone
Filter housingsAhead of the reverse osmosis unit.Water zone
Transfer pumpTote-to-tote moves only. A new demand pump feeds the header.Water zone
Sink, taps, floor drains, lined troughUnchanged. The drain line in step 10 ends at the middle-aisle floor drain.Step 10
Wall disconnect and ceiling power dropsMain switch and feeds for the rack outlet strips, if Facilities agrees.Electrician
Two pallet racks with flood traysMung and saffron racks, kept where they are.Not in this guide
Buckets and the bucket framePots on the robot floor and the ten vines.Not in this guide
Steel tables and wire shelvingPlanting table, two harvest tables, storage runs.Not in this guide
Handheld pH and EC meterReference for every tank probe.Step 11 and weekly
Two-part fertiliser and pH downStock A and B and the acid jug.Step 12
Small computers and probe circuits on the pending listCheck them against the order list before buying more.Step 12

Leaving the rack area: the third rack, the grow tents, the casters, the shared feed manifolds, and the old pumps and reservoirs. Count the old pumps and reservoirs before discarding them. They may serve the vine bay.


Tools

PVC cutter, primer and cement. Step drill and hole saws for the covers. 4 ft level. Luggage scale. Crimp tool and ferrules. Multimeter. Label printer. Kitchen scale and a cup. Bucket and timer. Light meter. Cardboard and a knife for mock-ups.


The steps

lift aislemiddle aislepostlevelling footslide supporttop beam

1Level the rack

  • E04 Levelling feet
  • E03 Rack rework
  1. Swap the casters for levelling feet, one post at a time.
  2. Level the frame along and across with a 4 ft level.
  3. Fit the slide supports for tiers 1, 2 and 3 at 2 ft 2 in, 4 ft 8 in and 7 ft 2 in.
  4. Set every slide support level. The channel slope is built into the cassette.

Check: Pull 50 lb sideways at 7 ft with a luggage scale. No foot moves.

lift aislemiddle aisletank deck with a 1 in lipleak sensor

2Tank deck and drip tray

  • C17 Drip tray under the six tanks
  • C16 Leak sensor, 24 V
  1. Lay the deck on the bottom rails across the whole bay.
  2. Seal the 1 in lip all round.
  3. Fix the leak sensor to the deck floor in the pump gap.

Check: Pour 1 L on the deck. It stays inside the lip and the sensor trips.

lift aislemiddle aisletank, south rowtank, north rowcover

3Tanks and covers

  • A01 Reservoir tank, 15 gal
  • A02 Tank cover
  • A05 Bulkhead fitting, 3/4 in
  1. Drill each cover on the bench first, using the cover plan below.
  2. Fit the suction bulkhead in the inner end wall, 1½ in above the floor.
  3. Wrap each tank in black-and-white film, white side out.
  4. Set three tanks flush with the lift-aisle face. Set three 10 in back from the other face.
  5. Label each tank with its cassette: A1-T1-S and so on.

Check: Six tanks fit between the posts with the covers on. A 10 in gap runs between the two rows.

lift aislemiddle aislepumppumpdrain valve

4Pump trains and drain valves

  • A03 Circulation pump, 24 V DC
  • A04 Pump speed trim
  • A06 Suction and discharge kit
  • A13 Drain valve, 3/4 in, motorised
  1. Build each train on the bench in the order shown below.
  2. Mount the pump below the water line so it is always flooded.
  3. Point the tee up for the riser. Put the drain valve on the side branch.
  4. Fit the speed trim module in the panel later. Leave its leads long.

Check: Fill the tank to 4 in. No drip at the bulkhead or the unions with the ball valve open.

lift aislemiddle aisleriser, one per cassetteflow sensor

5Risers and flow sensors

  • A07 Riser and return pipework
  • A10 Flow sensor, 1/2 in
  1. Run ½ in PVC from each tee up the spine to its own cassette. No tees between loops.
  2. Fit the flow sensor in the vertical run, arrow up, below the tier.
  3. Clip each riser to the frame every 3 ft and tag it with its loop name.

Check: Six risers per bay, each traced by hand from one pump to one cassette.

lift aislemiddle aislenozzle railfour nozzles

6Nozzle rails

  • A08 No-contact feed nozzle set
  1. Fix the rail bracket to the frame above the high end of the four channels.
  2. Cut four ¼ in tubes to the same length, 24 in.
  3. End each tube in a nozzle that points down at one channel inlet.
  4. Set each tip ½ in above the channel cap, inside the collar.

Check: Run the pump. Catch each nozzle in a cup for 30 seconds. The four agree within 15 percent.

lift aislemiddle aisletroughsensor portdownpipe to its own tank

7Return troughs, sensor ports and downpipes

  • A07 Riser and return pipework
  • A09 Sensor port in the return collector
  1. Fit one short trough per cassette in the spine, under the low end of its channels.
  2. Screw the plugged sensor port into the trough outlet.
  3. Run a 1½ in downpipe from each trough to its own tank cover.
  4. Tie a mesh sock over each downpipe outlet.

Check: Pour 2 L into each trough. All of it reaches the right tank.

lift aislemiddle aisledrip pan, slopes to the spinepan drain

8Drip pans, tiers 2 and 3

  • A09b Drip pan under tier 2 and tier 3 cassettes
  1. Hang a pan under each tier 2 and tier 3 cassette position.
  2. Slope it toward the spine.
  3. Pipe its drain into that cassette's own downpipe.

Check: Pour 1 L into each pan. All of it reaches that cassette's tank.

lift aislemiddle aislewater headerdropfill solenoid, then float valve

9Fill line

  • D09 Supply header and drops
  • A11 Fill solenoid valve, 1/2 in, 24 V DC
  • A12 Float valve, 1/2 in
  1. Drop ½ in pipe from the overhead header into the pump gap.
  2. Branch to each tank: solenoid valve first, then the float valve inside the cover.
  3. Set each float to close at 10 in of water.
  4. Leave the rack shut-off closed until step 16.

Check: Hold a solenoid open by hand. The float valve stops the water below the high switch.

lift aislemiddle aisledrain line, 1/2 in, to the floor drain

10Drain line

  • D13 Drain tube and fittings
  • D12 Drain line and aisle cover
  1. Run ½ in tube under the deck along the rack.
  2. Join each drain valve outlet to it with a push-fit tee.
  3. Cross the middle aisle to the floor drain under the low ramp. End the tube above the grate.

Check: Open one drain valve with the pump on. Water reaches the floor drain and nowhere else.

lift aislemiddle aislepH, EC, temperaturetwo level switches

11Probes and level switches

  • A15 pH kit
  • A16 Conductivity kit, K 1.0
  • A17 Solution temperature probe
  • A14 Level switch
  1. Fit the pH, conductivity and temperature probes at the aisle end of each cover.
  2. Fit the low switch 4 in above the tank floor and the high switch at 11 in.
  3. Keep the pH probe tip wet from now on.
  4. Route each lead up the nearest post, away from the pump leads.

Check: Lift each float by hand. The right input changes on the controller.

lift aislemiddle aislebay paneldosing boxpump switchesstock jugs

12Bay panel, dosing box, switches and jugs

  • C11 Enclosure, 16 x 14 x 7 in
  • C12 Back panel, DIN rail, terminals, fuses, wire
  • C01 PLC CPU
  • C02 Option module, 8 fast inputs and 6 outputs
  • C03 Input module, 16 x 24 V DC
  • C04 Relay output module, 8 point
  • C05 Analogue output module, 4 x 0-10 V
  • C06 Interposing relay and socket, 24 V coil, 10 A
  • C07 Bay computer
  • C10 I2C multiplexer
  • C14 Dosing box
  • A18 Dosing pump
  • A19 Dosing tube and fittings
  • C19 Hand-off-auto switch, one per pump
  • C15 Bay stock jugs and tray
  • C13 Field connectors, M12 five-pin
  1. Build the panel on a bench from the wiring table below.
  2. Mount it on the bay's post at the middle-aisle face, 4 ft up.
  3. Hang the dosing box under it and the switch strip under that.
  4. Run each dosing tube down to its tank cover. End it above the water.
  5. Stand the four jugs in their tray in front of the north tanks.

Check: Each pump runs from its switch in Hand with the controller off. Each dosing pump gives the same weight three times.

lift aislemiddle aislelight bars, six per pairrelay

13Light bars, lift and relays

  • B01 LED grow bar, 4 ft, white
  • B02 Leader cable with dimming, 10 ft
  • B03 Jumper cable with dimming, 2 ft
  • B04 Plug-in relay for the lights
  • B05 Light frame
  • B12 Light lift motor
  • B13 Frame height sensor and top switch
  • B10 Light sensor
  1. Bolt six bars to the two frame rails, across the depth.
  2. Push alternate bars toward opposite aisles.
  3. Hang the frame on four cords from the winding shaft under the tier above. The tube motor moves it between 6 and 17 in above the channels.
  4. Blinds and black panels go on after the cassettes fit. See the workplan, task 6.3.
  5. Link them with five jumpers. Plug the leader into the relay box.
  6. Plug the relay box into the rack's outlet strip.

Check: Nine light readings per cassette. The mean is 200 µmol/m²/s or more.

lift aislemiddle aisletwo fans per pair

14Fans

  • B06 Bay fan, 120 mm, 24 V
  • B07 Fan guards and frame bracket
  • B07b Moving cable loop
  • B08 Fan speed controller
  • B09 Air sensor, temperature and humidity
  1. Bolt the two fans of each pair to their bracket under the light frame rail, at the middle-aisle edge.
  2. Run the fan wires and the light leader in the moving cable loop. Run the frame top to bottom and check nothing snags.
  3. Blow toward the lift aisle on rack A.
  4. Wire the speed pin to the fan controller only. It takes 5 V. Never put 24 V on it.
  5. Fit the air sensor on each cassette side, shaded from the bars.

Check: Under 2 °C rise from intake to exhaust with the lights at full.

lift aislemiddle aislecassette, four channelsseated switch

15Cassettes

  • E01 Cassette
  • E02 NFT channels and lids, reused
  • B11 Cassette seated switch
  1. Fit four channels and their caps to each carrier.
  2. Slide each cassette in from its aisle until the seated switch closes.
  3. Check that each nozzle sits over a collared inlet hole.

Check: Pull and reseat each cassette 20 times. The pump stops first each time. No drip reaches the tier below.

16Power, water and first run

  • D01 24 V supply with battery backup, 20 A
  • D02 Backup battery, 24 V 100 Ah
  • D03 Battery cabinet
  • D03b Battery disconnect and fuse
  1. Stand the battery cabinet at the dry east end of the rack, under the supply panel.
  2. Connect battery, switch, fuse and supply with the switch open. Have the electrician check it. Then close the switch.
  3. Run 12 AWG from the supply to each bay panel, fused at 15 A.
  4. Open the rack water shut-off. Fill one tank at a time.
  5. Run 24 hours on water before adding fertiliser or plants.

Check: pull the supply's plug for 4 hours. Pumps run 1 minute in 5 and an alarm is sent.

Then repeat

Add tiers 1 and 2 of bay A1 to the same panel. Then build A2, A3, A4, B1 and B2 the same way. Log room temperature and humidity as each bay starts. Stop adding bays if the room passes 26 °C or 75 percent humidity.

The full test list and pass values are in section 11 of the build spec and on the Test log sheet of the order list.


Details

Tank wallinner endBulkhead¾ in, 1½ in upBall valve¾ in PVCStrainer50 meshUnionPump24 V, floodedUnionTeeup: riser to the cassetteDrain valveclosed at restDrain line½ inWater runs left to right. Unions on both sides let the pump come out in minutes.No brass anywhere. Tighten unions by hand only.
Step 4. The pump train, in order.
pHECTlowhighreturn, 1½ infill and float valveABpH-pH+aisle endpump gap endCover 24 × 12 in, seen from above. Positions are a guide: mark from the real probe and valve bodies.The suction bulkhead goes in the tank wall at the pump gap end, not in the cover.
Step 3. Drilling plan for a tank cover.
channel, high endchannel capcollar round the inlet holerail, fixed to the rack frame¼ in tube, 24 in, all four equal½ in gapdrip catch, drains to this cassette's return
Step 6. One nozzle over one channel inlet.

Step 12: what lands where in the bay panel

DeviceTagOn the wayLands on
PumpPFuse, then hand-off-auto switch, then 10 A relay, then speed trim moduleRelay module 1, points 1 to 6
Fill solenoidFVFuse, then 10 A relayRelay module 2, points 1 to 6
Drain valveDVDirect, 5 WRelay module 3, points 1 to 6
Low and high level switchLSL, LSHTwo wires eachInput module 1, points 1 to 12
Cassette seated switchZSTwo wiresInput module 2, points 1 to 6
Pull buttonOne per cassette, on the stripInput module 2, points 7 to 12
Flow sensorFTThree wires: 24 V, 0 V, pulseOption module inputs X1 to X6
Leak sensor; on-battery signalOption module inputs X7, X8
Light relay boxLT24 V signal, one per pairOption module outputs Y1 to Y3
Light dimmingLT0 to 10 V, one per pairAnalogue module, 1 to 3
pH and EC circuitsPH, ECProbe lead to its circuit in the panelBay computer bus, addresses 11 to 16 and 21 to 26
Dosing pumpsDA, DB, DD, DUPower through the dose-permit relayBay computer bus, addresses 31 to 84
Temperature probeTTThree wiresBay computer, one-wire pin
Air sensors, light sensor, fan controller, CO₂Through the multiplexerMultiplexer channels 0 to 6

Six of each device per bay, in the order T1-S, T1-N, T2-S, T2-N, T3-S, T3-N. Use an M12 connector at each field device so it swaps without rewiring. Set each bus address on the bench and write it on the part.